Change and configuration management, IT audit, business continuity and disaster recovery

In short: Uncontrolled changes cause many outages, so changes are planned, approved and recorded, and device configurations are backed up and compared to a baseline. Audits check that controls work. Business continuity keeps the organisation running during a disruption; disaster recovery restores IT afterwards.

Network change and configuration management (NCCM)

NCCM is the discipline of controlling every change to network devices and keeping their configurations known, backed up and compliant. NCCM tools typically:

  • Discover devices and keep an inventory.
  • Back up configurations automatically and keep version history.
  • Compare running configs with an approved baseline and alert on unauthorised changes.
  • Push approved changes to many devices at once and roll back if they fail.
  • Report on compliance with policies and standards.

Change management best practice

Steps in a network changeRequestraise a changeAssessimpact, rollbackApproveCAB sign-offImplementagreed windowReviewtest, document
Figure 1. Every change is requested, assessed, approved, carried out in a planned window and reviewed.
  • A change advisory board (CAB) reviews significant changes for risk, timing and impact.
  • Every change has a written plan, a test plan and a rollback plan.
  • Changes happen in agreed maintenance windows and are communicated in advance.
  • Emergency changes are allowed, but documented and reviewed afterwards.

IT audit

An IT audit independently checks whether IT controls are designed well and actually working. Auditors review access rights, change records, backup and restore tests, patch levels, logs, physical security and compliance with policy and law. The result is a list of findings with risk ratings and agreed actions.

Business continuity and disaster recovery

Business continuity (BC)Disaster recovery (DR)
FocusKeeping the whole organisation runningRestoring IT systems and data
ScopePeople, premises, suppliers, processes and ITServers, networks, applications, backups
WhenDuring and after the disruptionAfter the incident

Planning starts with a business impact analysis (BIA), which identifies critical processes, the cost of downtime and how quickly each must recover.

RPO and RTO on a disaster timelineLast good backupDisasterService restoredRPO: data you could loseRTO: time to recover
Figure 2. The recovery point objective limits lost data; the recovery time objective limits downtime.
  1. Carry out the BIA and risk assessment.
  2. Choose recovery strategies (backup site, replication, cloud).
  3. Write the plan with clear roles and contact lists.
  4. Train staff.
  5. Test the plan regularly and update it after every test and change.

Common mistakes: never testing the plan, leaving it out of date, keeping it only on the systems that have failed, and ignoring people and suppliers.

Data loss: causes and prevention

CausePrevention
Human error (accidental deletion or overwrite)Backups, version history, permissions, training
Hardware failureRAID, monitoring disk health, replacing ageing equipment
Malware and ransomwareEndpoint protection, patching, offline backups
Theft of devicesFull-disk encryption, physical security, remote wipe
Power problems and natural disastersUPS, surge protection, off-site copies
Data leaking outData loss prevention (DLP) tools, classification, email and USB controls

Real-world example: a change that went wrong, and recovered

An engineer at a fictional logistics company changed an access list on the head office firewall late one afternoon to open a port for a new supplier. The rule was placed above an existing one and blocked the warehouse scanners from reaching the stock system. Because the company used change management, the change had a ticket, a named owner and a written rollback plan. The service desk linked the scanner complaints to the change within minutes, the engineer restored the saved configuration, and the warehouse was working again in under half an hour. The post-change review led to a new rule: firewall changes are made in a scheduled window and tested against a short checklist of critical systems.

Practice

What should every change request include apart from the change itself?
A test plan and a rollback plan, plus the risk assessment and approval.
Your RPO is 4 hours. How often must backups or replication run?
At least every 4 hours, so no more than 4 hours of data can be lost.
BC or DR: arranging for staff to work from another office?
Business continuity: it keeps the organisation running, not just IT.

Key takeaways

  • NCCM backs up configs, detects unauthorised changes and enforces baselines.
  • Changes need approval, a test plan and a rollback plan.
  • IT audits check that controls exist and work.
  • BC keeps the business running; DR restores IT. Both start with a BIA.
  • RPO limits data loss; RTO limits downtime.
Tracks your learning on this device only. See your progress on the learning paths.

About the author

Mohamed Fayas

Founder of FM TecHub. CCNA certified, with a BTEC HND in Network Engineering, and BEng (Hons) in Computer Networking and Cloud Security. He writes practical, plain-English guides on networking, security and cloud.

More about the author

Original content written by Mohamed Fayas for FM TecHub. © 2026 FM TecHub. You're welcome to share a link to this page; please don't copy the text elsewhere without permission.

Stay up to date by email

New notes, tools and security news from FM TecHub, explained simply. Free.

We only use your email to send these updates. See our privacy policy.