Free tech learning for everyone, from basics to pro

Network ArchitectureNetworking SecurityIntermediate

Network total cost of ownership (TCO): comparing designs and vendors over five years

In short: The cheapest network to buy is not always the cheapest to own. Total cost of ownership adds up hardware, licences and subscriptions, support, circuits, cloud charges, power and space, staff time, training and eventual replacement over the network's life, usually five years. Comparing options on TCO, alongside risk and capability, leads to better decisions than comparing purchase prices.

Why TCO

A switch that costs 20 percent less may need a yearly subscription, an extra power supply for PoE, more engineer time and a separate monitoring tool. Over five years it can cost much more. Total cost of ownership makes these differences visible.

Total cost of ownership for a networkHardware and opticspurchase or leaseLicences and subscriptionsper device, per yearSupport contractsvendor and partnerCircuits and cloudmonthly chargesPeople and operationsdesign, run, trainPower, space, coolingfacilities costs
Figure 1. The purchase price is often less than half of what a network really costs over five years.

What to include

  • Capital costs (capex): switches, routers, firewalls, access points, optics, cabling, racks, power supplies.
  • Licences and subscriptions: many vendors now sell features as term subscriptions (DNA, Meraki, SD-WAN, threat prevention). Note whether the device stops working, or loses features, if the subscription lapses.
  • Support: vendor support and hardware replacement contracts, partner managed services.
  • Circuits and cloud: internet, WAN, private cloud connections, cloud networking and data transfer charges.
  • Facilities: power, cooling and rack space, especially in colocation where they are billed directly.
  • People: design, installation, daily operations, troubleshooting, training and certification. A platform that saves each engineer a few hours a week is worth a lot.
  • Tools: monitoring, automation, security and backup tools the design needs.
  • Refresh and exit: when the equipment must be replaced, and the cost of migrating away later.

A simple five-year model

Cost itemOption A (on-premises managed)Option B (cloud managed)
Hardware (year 0)200,000170,000
Licences / subscriptions (5 years)40,000150,000
Support (5 years)75,000included
Management servers and tools30,0000
Staff time (estimated)250,000175,000
Total595,000495,000

The figures are illustrative only. The point is to put every option in the same table with the same assumptions, and to state those assumptions clearly.

Beyond cost

TCO should sit next to other factors: risk, capability, security, vendor stability, skills available in the market and fit with your architecture principles. The lowest TCO option is not automatically the right one, but decisions become transparent.

Tips

  • Ask vendors for five-year pricing including renewals, not just year one.
  • Check price increases written into contracts and what happens at end of term.
  • Include the cost of downtime if options differ in resilience.
  • Revisit the model after a year with real numbers.

Real-world example: the cheap firewall

A company chose a firewall that was 30 percent cheaper to buy. In year two it discovered that TLS inspection, sandboxing and the management console each needed separate subscriptions, and the hardware needed upgrading to handle inspection at full speed. Over five years it cost 40 percent more than the option it had rejected. Its next purchase used a TCO model with all required features included from day one.

Practice

Why can a cheaper device have a higher TCO?
Subscriptions, support, extra hardware, tools and staff time over its life can outweigh the lower purchase price.
Name four cost categories in a network TCO model.
Any four of: hardware, licences/subscriptions, support, circuits/cloud, facilities, people, tools, refresh/exit.
What should accompany a TCO comparison when making a decision?
Risk, capability, security, vendor stability, skills and fit with architecture principles.

Key takeaways

  • TCO adds up all costs over the network's life, typically five years.
  • Include subscriptions, support, circuits, facilities, people and exit costs.
  • Compare options in one model with stated assumptions.
  • Use TCO alongside risk and capability, not instead of them.
Tracks your learning on this device only. See your progress on the learning paths.
Verified author✓ Valid
Issued to
Mohamed Fayas
Role
Founder of FM TecHub
Credentials
CCNABTEC HND Network EngineeringBEng (Hons) Computer Networking & Cloud Security
Issuer
FM TecHub · fmtechub.com

He writes practical, plain-English guides on networking, security and cloud.

More about the author →

Original content written by Mohamed Fayas for FM TecHub. © 2026 FM TecHub. You're welcome to share a link to this page; please don't copy the text elsewhere without permission.

Email updates: coming soon

New notes, tools and security news from FM TecHub by email, explained simply. Free. We're not collecting email addresses yet; see our privacy policy.

PortServiceStatus
SMTP/25Email updatesopening soon

Meanwhile, stay connected: